That's Clever.
Installed in 4–7 months for 20% less than stick-built. From California's only vertically integrated, family-owned and operated modular factory.
Build it in our factory.
Your next housing project — ADU, multifamily, or small-lot subdivision — built in California's only family-owned, HCD-certified modular factory. Faster, for less, with zero compromise.
The system behind the answer.
Clever Elements is our modular system of three pre-engineered floor plans — Blocks A, B, and C — that stack, pair, and mirror to build anything from a backyard 2-story ADU to a small apartment building.
Pre-approved plans. CA HCD certified and Title 24 compliant. Standing seam metal roof, HardiePanel siding, quartz countertops, name-brand appliances — premium materials standard.
Engineered specifically for tight California lots, SB 1211 surface-parking infill, and SB 684/1123 small-lot subdivisions where each Block A becomes a for-sale starter home.
Which path is yours?
One factory, four motions. Pick the path that fits your project.
I own a multifamily property
Run SB 1211 math on your fourplex or sixplex.
ExploreI'm a homeowner exploring an ADU
Permanent foundation. AB 1033, AB 1154, and SB 543 are on your side.
ExploreI'm a developer or builder
SB 684/1123 small-lot, SB 79 TOD, missing-middle infill. BIM and capacity.
ExploreI'm with an agency or nonprofit
HCD-certified, prevailing-wage capable, AB 130 CEQA-eligible.
ExploreA system unlike any other — that delivers homes unlike any other.
-
In-house architectureLed by an international-award-winning architect.
-
Digital factoryRun by in-house "Clever ERP" — AI software built for factory-built housing.
-
85,000 sq ft facilityHas delivered stunning homes nationwide for years.
We're the only at‑scale CA Factory‑Built Housing manufacturer not owned by private equity.
Most modular companies are five years into a seven-year fund cycle. We are 100% owner-operated.
That means our warranty outlasts the next downturn, and your project is never a line item in someone's exit plan. Decisions get made in days, not after a quarterly board meeting. Our owners are still here, in the factory, on the phone — every day.
4–7 months. End to end.
Design + Quote
Your property, our recommendation, a fixed installed budget.
Permits Submitted
California ADU law sets a ministerial 60-day clock. SB 543 makes the 15-day completeness check enforceable, too.
Factory Build
Built in our Ensenada factory. Tracked in your portal.
Ship + Install
Flatbed delivery, single-day crane install per unit.
Move-In or Lease-Up
Final inspection. You start showing units.
Ready to run the numbers?
Tell us about your property. We'll come back with a feasibility analysis, a unit recommendation, and an installed budget — within five business days.