Clever neighborhood concept · Not a completed public-agency project

Move your housing plan toward move-in day.

Give your community more places to live. Clever works with public agencies and nonprofits to explore permanent modular housing, connecting resident needs and project requirements with in-house design and our own factory.

Start with the people you serve, the site and the stage of your program.

Clever neighborhood concept · Not a completed public-agency project

A housing proposal must work for residents, your board and funders.

Your team has to serve residents while answering to a board, a community and the requirements of the funding source. A building proposal only helps if you can explain how it fits the site, the program and the responsibilities of your delivery team.

Begin with the residents.

Translate household sizes, accessibility needs and how the homes will be managed into a program the design team can work with.

Review requirements before commitments.

Bring procurement, labor, sourcing and funding conditions into the discussion early. Identify the documentation and specialist review your program needs.

Make responsibilities clear.

Separate factory design and production from site work, installation and local approvals so your team can plan the whole project.

Know what the site can deliver before you commit the program.

The applicable housing pathway affects how many households a site can serve, the building layout and the approval work to plan for. We bring that review into the design discussion with your team and advisers, alongside accessibility, funding and procurement requirements. That gives your team a clearer basis for the next decision.

Understand the approval responsibilities
Concept for multiple Elements homes around a landscaped shared space
Elements housing arrangement · Concept rendering
A craftsperson at work in the Clever factory
Inside the Clever factory in Ensenada.

See the people and production behind the proposal.

A public housing decision needs evidence you can take back to your team. Clever is family-owned, with its own factory and in-house designers. A factory visit lets you inspect how we work and ask the people responsible about your program.

Meet the team. Visit the factory.
sq ft factory in Ensenada
85,000
homes delivered
300+
team members
120+
homes produced
3 / week

Clever manufacturing figures, including Clever Tiny Homes. Modular production is scheduled by project.

Design around the households you need to serve.

Clever Elements gives design and engineering a head start with modular starting blocks and standardized details. Shape the home mix, accessibility and specification around the households you serve.

A program shaped to the site

Concept rendering · Configuration confirmed for your project

Discuss family-sized homes, a different unit mix or a custom residential configuration.

These are examples within Clever Elements. Your project can use another layout or combination; changes may need additional engineering and approval review.

Give your team a clear route to the next decision.

  1. Share the housing brief.

    Bring the resident needs, site, funding or procurement stage and the people involved in delivery.

  2. Review fit and requirements.

    Review the housing pathway, household capacity and approval responsibilities with your advisers, then shape the Elements design and factory scope.

  3. Define the delivery agreement.

    Confirm specifications, approvals, procurement conditions and responsibilities before scheduling production.

Make the requirements part of the first conversation.

A useful review identifies what is known, what needs evidence and who is responsible for the next decision.

Read the factory and local approval guide
Is your product automatically eligible for our funding program?

No. Eligibility depends on the program, procurement, sourcing, labor rules, ownership and proposed use. Bring the actual requirements for review with your qualified advisers before treating a configuration as eligible.

Can you accommodate accessibility requirements?

Bring the resident and program requirements at the start. The design team can review the layout and the additional design or engineering needed. Compliance must be confirmed for the selected configuration and site.

Can our team visit the factory?

Yes, factory visits in Ensenada are by appointment. Tell us who will attend and what you need to understand about design, production and quality control.

Who handles the local site work?

The factory scope and the responsibilities of the local design and construction team are agreed for each project. Foundations, infrastructure, installation and local approvals must be included in the delivery plan.

Start with the community you want to house.

Send the brief you have today. We’ll discuss where modular housing could fit and what your team needs to evaluate next.

The planning pack includes concept plans and a site-and-budget checklist. No form required.