Our process

From your site to a finished home.

The schedule depends on design, approvals, utility work, production availability and installation. We identify where factory and site work can overlap and agree milestones for your project.

The seven steps

From first conversation to move-in.

1
Agreed by project

Initial project review

Share the site and who you want to house. We connect the applicable housing pathway to a realistic home count and project type before developing the design. A detailed feasibility scope is agreed separately.

Detailed feasibility is scoped separately.
2
Agreed by project

Site visit and engagement

Review access, utilities and site constraints with the local team. Identify survey, geotechnical or other investigations needed, then agree the design and permitting engagement.

3
Agreed by project

Home design and approval plan

Our in-house team uses Clever Elements starting blocks and standardized details to develop your layout. We scope customization, engineering and the factory and local approval responsibilities together.

4
Agreed by project

Permit submittal

Eligible ADU applications generally receive a decision within 60 days of completeness, subject to statutory conditions. Design, completeness review, utilities, installation and final inspections are separate.

Eligibility and completeness matter.
5
Agreed by project

Factory build

Once permits are issued and your contract is fully executed, your units enter production at our Ensenada factory. You track build progress through your dedicated customer portal — same system used by the wider Clever customer base.

6
Agreed by project

Site prep and foundations

The local construction team prepares foundations, underground services and access. Where approvals and site readiness allow, this work can overlap with factory production.

7
Agreed by project

Crane install and final inspection

Coordinate delivery, crane access, assembly, connections and final inspections. The installation sequence depends on the configuration and site.

What's in the price

Confirm the total project budget.

Define the factory proposal

  • Factory scope defined in the proposal
  • Design and approval responsibilities
  • Production and delivery milestones
  • Written inclusions, exclusions and warranty terms

Confirm who carries these costs

  • Site preparation, grading and foundations
  • Transport, access and crane work
  • Utility connections and service upgrades
  • Local permits, fees and inspections
  • Design changes and finishes outside the agreed package
Parallel factory and site work

Build the homes while the site is prepared.

Factory production can overlap with foundations and utility work on site. Coordinating those activities can reduce time spent waiting between stages. The opportunity depends on the design, approvals and site readiness.

Phase
Plan
Review
Prepare
Build
Coordinate
Install
Handover
Feasibility + design
Project-specific
Permitting
Project-specific
Factory build
Project-specific
Site prep + foundations
Can overlap
Crane install + finish
Project-specific

Illustrative. Specific schedules confirmed during pre-construction.

Where does your project stand?

Bring your address, ideas and any work already completed. We’ll discuss the next decisions and how the factory fits into the plan.