How a Clever home gets built

One factory, every stage.

Architecture through install — in-house and accountable. Every Clever Builds unit flows through the same seven stages on our Ensenada factory floor.

Architecture & engineering

In-house BIM, drafting, code review

Materials & sourcing

Sheffield, James Hardie, American Standard

Framing & shell

Engineered for 140 mph wind, severe seismic

MEP rough-in

Mini-split HVAC, HRV, Title 24 compliant

Finish carpentry

Quartz countertops, LVP, name-brand fixtures

500-point QA

Inspected before it leaves the factory

Ship & install

Single-day crane install with CA partners

Units in production on the factory floor.
Units in production on the factory floor.
Team member working on a finish stage.
Team member working on a finish stage.

Ready to start your project?

Tell us about your property. We'll come back with feasibility, budget, and timeline — within 5 business days.