Small-lot subdivision: plan the homes and the ownership together

SB 684 and SB 1123 create a ministerial route for qualifying subdivisions of up to ten parcels and housing developments of up to ten units. Eligibility depends on the site and the proposed development.

By Clever Builds · Reviewed

Which sites should be screened?

SB 684 applies to qualifying sites in multifamily residential zones. SB 1123 extends the pathway to qualifying vacant sites in single-family residential zones. The laws set different parcel-size limits and include location, site, housing and subdivision conditions; this is not blanket permission to split any lot into ten. [1, 2]

Decide the ownership structure early

HCD has clarified that qualifying common-interest developments can use the pathway. The zoning must allow the required residential use; a commercial zoning label alone does not establish eligibility. [2]

For a Clever concept study, establish the ownership structure alongside the site layout. Ask the surveyor and civil team about frontage, access, drainage, utility service and shared areas. Then test how repeated homes could fit, where delivery occurs and which walls need special treatment.

How modular could fit

Illustrative study: compare a row of repeated two-story homes with paired homes around shared open space. Repetition may simplify purchasing and production, but parcel boundaries, fire separation, accessibility and utility arrangements can change the design. A townhouse rendering is a starting point for this discussion, not a subdivision approval.

What to bring to a first review

Bring the address or APN, zoning information, current survey if available, existing structures and occupancy history, target home count, and whether you plan to rent or sell. We can discuss the home program while your local professionals verify the land-use and map requirements.

A useful feasibility scope should assign responsibility for subdivision mapping, civil engineering, entitlement analysis, architecture, manufacturing and installation before a project schedule is agreed.

Official sources

  1. ABAG: SB 684 and SB 1123 implementation
  2. HCD technical assistance: Hayward, January 2025

This is a planning overview, not a parcel-specific legal determination. Review the current statute and local implementation with your project’s qualified advisers.